Dimitrakopoulos, Roussos
Advances in Applied Strategic Mine Planning
Part I. Early Concerns and Innovative Responses
1. Beyond Naïve Optimisation
P. H. L. Monkhouse, G. A. Yeates
2. Optimal Mining Principles
Brett King
3. The Global Optimiser Works—What Next?
J. Whittle
4. Blasor—Blended Iron Ore Mine Planning Optimisation at Yandi, Western Australia
P. Stone, G. Froyland, M. Menabde, B. Law, R. Pasyar, P. H. L. Monkhouse
5. Roadblocks to the Evaluation of Ore Reserves—The Simulation Overpass and Putting More Geology into Numerical Models of Deposits
A. G. Journel
6. Quantification of Risk Using Simulation of the Chain of Mining—Case Study at Escondida Copper, Chile
S. Khosrowshahi, W. J. Shaw, G. A. Yeates
7. A Risk Analysis Based Framework for Strategic Mine Planning and Design—Method and Application
M. Godoy
8. Mining Schedule Optimisation for Conditionally Simulated Orebodies
M. Menabde, G. Froyland, P. Stone, G. A. Yeates
9. Stochastic Mine Planning—Methods, Examples and Value in an Uncertain World
R. Dimitrakopoulos
Part II. Increasing Value and Technical Risk Management
10. The Value of Additional Drilling to Open Pit Mining Projects
G. Froyland, M. Menabde, P. Stone, D. Hodson
11. Stochastic Optimisation of Long-Term Production Scheduling for Open Pit Mines with a New Integer Programming Formulation
S. Ramazan, R. Dimitrakopoulos
12. Stochastic Long-Term Production Scheduling of Iron Ore Deposits: Integrating Joint Multi-element Geological Uncertainty and Ore Quality Control
J. Benndorf, R. Dimitrakopoulos
13. Stochastic Mine Planning—Example and Value from Integrating Long- and Short-Term Mine Planning Through Simulated Grade Control, Sunrise Dam, Western Australia
A. Jewbali, R. Dimitrakopoulos
14. A New Methodology for Flexible Mine Design
B. Groeneveld, E. Topal, B. Leenders
15. Direct Net Present Value Open Pit Optimisation with Probabilistic Models
A. Richmond
Part III. Simultaneous Optimisation of Multiple Operations and Processes
16. Simultaneously Optimizing Open-Pit and Underground Mining Operations Under Geological Uncertainty
L. Montiel, R. Dimitrakopoulos, K. Kawahata
17. Combining Optimisation and Simulation to Model a Supply Chain from Pit to Port
P. Bodon, C. Fricke, T. Sandeman, C. Stanford
18. Network Linear Programming Optimisation of an Integrated Mining and Metallurgical Complex
E. K. Chanda
19. Open Pit Transition Depth Determination Through Global Analysis of Open Pit and Underground Mine Production Scheduling
K. Dagdelen, I. Traore
20. Consideration for Multi-objective Metaheuristic Optimisation of Large Iron Ore and Coal Supply Chains, from Resource to Market
J. Balzary, A. Mohais
Part IV. Stochastic Simulation for Strategic Mine Planning
21. Application of Conditional Simulations to Capital Decisions for Ni-Sulfide and Ni-Laterite Deposits
O. Tavchandjian, A. Proulx, M. Anderson
22. Simulation of Orebody Geology with Multiple-Point Geostatistics—Application at Yandi Channel Iron Ore Deposit, WA, and Implications for Resource Uncertainty
V. Osterholt, R. Dimitrakopoulos
23. New Efficient Methods for Conditional Simulations of Large Orebodies
J. Benndorf, R. Dimitrakopoulos
24. Transformation Methods for Multivariate Geostatistical Simulation—Minimum/Maximum Autocorrelation Factors and Alternating Columns Diagonal Centres
E. M. Bandarian, U. A. Mueller, J. Fereira, S. Richardson
25. Strategies for Mine Planning and Design
P. A. Dowd, C. Xu, S. Coward
Part V. Other Aspects of Open Pit Mine Planning
26. Planning, Designing and Optimising Production Using Geostatistical Simulation
P. A. Dowd, P. C. Dare-Bryan
27. Geometallurgical Modelling and Ore Tracking at Kittilä Mine
D. Rosa, L. Rajavuori, J. Korteniemi, M. Wortley
28. Predicting Mill Ore Feed Variability Using Integrated Geotechnical/Geometallurgical Models
J. Jackson, J. Gaunt, M. Astorga
29. Using Grade Uncertainty to Quantify Risk in the Ultimate Pit Design for the Sadiola Deep Sulfide Prefeasibility Project, Mali, West Africa
S. P. Robins
30. Applicability of Categorical Simulation Methods for Assessment of Mine Plan Risk
A. Jewbali, R. Perry, L. Allen, R. Inglis
Part VI. Optimisation of Underground Mine Planning
31. Cut-off Grade Based Sublevel Stope Mine Optimisation
M. T. Bootsma, C. Alford, J. Benndorf, M. W. N. Buxton
32. Classification of Mining Methods for Deep Orebodies
V. Oparin, A. Tapsiev, A. Freidin
33. Grade Uncertainty in Stope Design—Improving the Optimisation Process
N. Grieco, R. Dimitrakopoulos
34. Strategic Optimisation of a Vertical Hoisting Shaft in the Callie Underground Mine
M. G. Volz, M. Brazil, D. A. Thomas
35. Strategic Underground Mine Access Design to Maximise the Net Present Value
K. G. Sirinanda, M. Brazil, P. A. Grossman, J. H. Rubinstein, D. A. Thomas
Part VII. Advances and Applications in Mine Optimisation
36. Production Schedule Optimisation—Meeting Targets by Hedging Against Geological Risk While Addressing Environmental and Equipment Concerns
M. Spleit
37. A Stochastic Optimization Formulation for the Transition from Open-Pit to Underground Mining Within the Context of a Mining Complex
J. MacNeil, R. Dimitrakopoulos
38. An Open-Pit Multi-Stage Mine Production Scheduling Model for Drilling, Blasting and Excavating Operations
E. Kozan, S. Q. Liu
39. Optimising the Long Term Mine Landform Progression and Truck Hour Schedule in a Large Scale Open Pit Mine Using Mixed Integer Programming
Y. Li, E. Topal, S. Ramazan
40. Solving a Large SIP Model for Production Scheduling at a Gold Mine with Multiple Processing Streams and Uncertain Geology
M. Freitas Silva
Part VIII. Contributions to Strategic Innovation
41. Stochastic Optimisation of Mineral Value Chains—Developments and Applications for the Simultaneous Optimisation of Mining Complexes with Uncertainty
R. Goodfellow, R. Dimitrakopoulos
42. Sensor Based Real-Time Resource Model Reconciliation for Improved Mine Production Control—A Conceptual Framework
J. Benndorf, M. Buxton, M. S. Shishvan
43. On the Joint Multi Point Simulation of Discrete and Continuous Geometallurgical Parameters
K. G. Boogaart, R. Tolosana-Delgado, M. Lehmann, U. Mueller
44. Geologically Enhanced Simulation of Complex Mineral Deposits Through High-Order Spatial Cumulants
H. Mustapha, R. Dimitrakopoulos
45. Optimising a Mineral Supply Chain Under Uncertainty with Long-Term Sales Contracts
J. Zhang, R. Dimitrakopoulos
Nyckelord: Earth Sciences, Mineral Resources, Industrial and Production Engineering, Probability Theory and Stochastic Processes, Simulation and Modeling
- Utgivare
- Dimitrakopoulos, Roussos
- Utgivare
- Springer
- Utgivningsår
- 2018
- Språk
- en
- Utgåva
- 1
- Sidantal
- 13 sidor
- Kategori
- Naturvetenskaper
- Format
- E-bok
- eISBN (PDF)
- 9783319693200
- Tryckt ISBN
- 978-3-319-69319-4